Published: Građevinar 57 (2005) 6
Paper type: Subject review
Download article (Croatian): PDF
Download article (English): n/a
Changes to Construction Act and detailed design conformity certificate
Abstract
The most significant modifications of and additions to the Construction Act, as approved by the Croatian Parliament in July 2004, are described. They are in most instances related to the procedure for the delivery of building permits. The emphasis is placed on the submission of valid and complete applications and on the quality of detailed design documents, as well as on the responsibilities assumed by clients and designers. A special attention is placed on provisions relating to the already introduced certificate which is issued as a proof of conformity of detailed designs with relevant laws. The term "provision of services at a single location" is introduced instead of the corresponding English phrase "one-stop-shop".
Keywordsprovision of services at a single location, building permit, detailed design conformity, Construction Act, modifications of and additions to the Construction Act